Professional production of precision steel pipe and steel bar!

China Astm A106 Seamless Steel Pipe Manufacturers - High Quality Grouting sleeve – Hengye

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

We stick to the principle of "quality first, service first, continuous improvement and innovation to meet the customers" for the management and "zero defect, zero complaints" as the quality objective. To perfect our service, we provide the products with the good quality at the reasonable price for Stainless Steel Seamless Pipes And Tubes, Seamless Metallic Tube, Alloy 20 Seamless Pipe, We welcome new and old customers from all walks of life to contact us for future business relationships and mutual success!
China Astm A106 Seamless Steel Pipe Manufacturers - High Quality Grouting sleeve – Hengye Detail:

Key techniques for installing prefabricated components  

(1) It is particularly important to measure and control the installation quality of prefabricated wall panels. It is necessary to do a good job of positioning and wiring before lifting and strictly control the accuracy.  

(2) check the accuracy of the position of the positioning bar before installation, and the rust of the steel bar should be finished before lifting, so as to ensure that the wall panel can be accurately and quickly positioned.  

(3) A 1cm groove is reserved for the connection between the bottom of the precast member and the floor to facilitate the grouting of the cavity after the fixed member and lifting.  

Prefabricated wallboard positioning and installation process  

1. Measurement correction  
(1) the theodolite is installed on the board and installed on the center line, using the theodolite will adjust the center line on the wall panel and the center line on the floor in the same plane.
(2) Use the vertical ball and 500mm control line to accurately position the external wall, and control the verticality of the wall panel to meet the requirements of the specification.
(3) Wall panel installation precision fine tuning.

2. Grassroots treatment  
Before grouting, the components should be cleaned up in contact with the grouting material to ensure that there is no ash, no oil, no water, that is, the contact part between the bottom of the floor and the wall plate and the grouting material should be cleaned up, so as not to affect the steel bar connection after grouting.

3. Grouting cavity seal  
According to the component and site construction conditions, appropriate joint treatment method is adopted to seal the grouting cavity to ensure that joint mortar will not flow out.  In the project, 1:2.5 waterproof cement mortar was used to seal the gap edge between the wall panel and the floor of the sleeve grouting cavity.  Remove the grouting and drainage pipe on the component and seal the hole to make sure it is clean and free of sundries.

4. Preparation for grouting construction
Prepare containers, mixing tools, weighing instruments, joint grouting materials and mixing water.

5 Prepare grouting material  
Special qualified grouting material should be used, and the mixing quantity of each grouting material should be determined strictly according to the initial setting time and grouting speed of the grouting material, so as to ensure the one-time completion of each grouting division and avoid the waste of grouting material.  The proportion of grouting material and mixing time shall be carried out according to the product instructions provided by the manufacturer. Weigh the specified proportion of water according to the amount of grouting material and mix the mortar evenly with mixing tools.
6 check the joint slurry  

Check the fluidity and bleeding of mortar, if normal, wait for 2-3min, so that the bubbles in the sand naturally discharged.

7 Grouting division  
The reinforcement wall panels shall be cut off and accumulated according to the wall panels before hoisting, and the grouting area shall be divided according to the design zoning drawing. It is necessary to ensure that each grouting area is closed around and in close contact with the floor and wall.

8 Grouting from the grouting hole to the sleeve
Special grouting equipment and pressure grouting method are used for joint grouting.  Note that mortar should be calculated from the time of mixing with water. In the specified time, a grouting unit can only be injected from one grouting mouth, not from multiple grouting mouths at the same time.

9. Block up grouting and drainage holes  
After the mortar flows out of the sleeve grouting hole, it should be blocked immediately. For example, when grouting multiple joints at a time, the grouting or grouting hole that has been discharged cement mortar should be blocked successively until the grouting of all joints is blocked.

10 final inspection  
After confirming that all joints have been grouting, the joint grouting connection of one component is completed.

11 Specimen Test  
Sleeve connection and grouting construction is the key point in the project. While completing the acceptance of relevant procedures on site, it is necessary to make sleeve connection specimens and grouting material test blocks, do maintenance according to the test requirements, and send them to the laboratory for relevant tensile and compressive tests after reaching the corresponding age.

Product Display


Product detail pictures:

China Astm A106 Seamless Steel Pipe Manufacturers - High Quality Grouting sleeve – Hengye detail pictures

China Astm A106 Seamless Steel Pipe Manufacturers - High Quality Grouting sleeve – Hengye detail pictures

China Astm A106 Seamless Steel Pipe Manufacturers - High Quality Grouting sleeve – Hengye detail pictures


Related Product Guide:

We generally continually give you quite possibly the most conscientious shopper company, and the widest variety of designs and styles with finest materials. These endeavours include the availability of customized designs with speed and dispatch for China Astm A106 Seamless Steel Pipe Manufacturers - High Quality Grouting sleeve – Hengye , The product will supply to all over the world, such as: Egypt, Zurich, Chile, We firmly think that we have the full capability to present you contented merchandise. Wish to collect concerns within you and build a new long-term synergy romantic relationship. We all significantly promise:Csame excellent, better selling price; exact selling price, better quality.
  • Reasonable price, good attitude of consultation, finally we achieve a win-win situation,a happy cooperation!
    5 Stars By Sarah from Swedish - 2017.07.28 15:46
    The company keeps to the operation concept "scientific management, high quality and efficiency primacy, customer supreme", we have always maintained business cooperation. Work with you,we feel easy!
    5 Stars By Marcie Green from Germany - 2018.12.28 15:18
    Write your message here and send it to us